Back to Blog
Basic cocomo model staffing cacluclation7/10/2023 ![]() Product 1: A semi-detached mode product delivering 75,000 lines of code. ![]() ![]() Number of People = Effort / Development Time persons.Using the Basic COCOMO 81 model (see the tables and formulae below), calculate the effort required (in person-months), the overall development time, and the number of personnel required for each product described below.
0 Comments
Read More
Leave a Reply. |